Facility Planning

  • Global evaluation of typology and of the position of operating plant
  • Analysis of the characteristics of machineries and technological plants
  • Analysis of the products that need to be produced
  • Optimisation of the structure with regards to the organization and operational requirements for the industrial production plant 
  • Financial analysis
  • Analysis includes: Lay-out, material flow, personnel flow, OEE and equipment saturation,warehousing,production transfer


Construction and Commissioning Management

  • Construction and Commissioning Management with the development of procedures needed as support for subsequent  validation activities, including the necessary authorizations from various institutions


Diagnostics and Special Structures

  • Design of particular interventions on civil and industrial structures, such as bridges, tanks, machineries, etc.

Progitec S.r.l.
Viale P.L. Nervi 56 , 04100 Latina (LT), Italy - Tel/Fax: +39 0773.62 33 39 - E-mail:This email address is being protected from spambots. You need JavaScript enabled to view it. - P.Iva: 02229300591